hydro

WKO Wien

WKO Wien
  • ArchitectProf. Arch. Eduard Neversal - Maurer Lange Gasse 134 - 1230 - Wien - Austria
  • Year2009
  • CityWieden
  • CountryAustria

During the complete renovation of the building, numerous measures were implemented to improve energy efficiency and achieve a contemporary architectural appearance. Instead of the specified post-and-beam construction, a so-called window façade with insulated frame posts was chosen, which from the outside resembles a post-and-beam structure. In the parapet area, appropriately thick thermal insulation was installed between the window constructions. Thanks to the chosen construction method and other interior measures, the potential annual savings in energy costs is at least 25 percent. The renovation was carried out while the building remained fully operational.

WICONA systems used

WICLINE 75 TOP

WICTEC 50

Want to know more?

Contact us

Are you looking for professional advice? Do you have a suggestion that you would like to share with us? Get in contact with an expert by clicking on the link below.

Contact us
hydro
TECHNIK FÜR IDEEN